Value Chain Report on the Data Center Industry in Brazil¶
Abstract¶
Brazil has emerged as Latin America’s largest and fastest-growing data-center market, underpinned by accelerating cloud adoption, artificial-intelligence (AI) workloads, 5G roll-outs, and the digitalization of enterprises and government services. This report dissects the Brazilian data-center value chain from initial planning through advanced service delivery, detailing the activities, key players, commercial relationships, bottlenecks, and prevailing business models at every stage. Installed IT power capacity is already approaching 0.8 GW and is forecast to surpass 1.2 GW by 2029, with cumulative investments that could reach R$ 2 trillion in the coming decade. While global colocation giants (Ascenty, Equinix, Scala, Cirion) dominate hyperscale and carrier-neutral facilities, a dense ecosystem of engineering firms, integrators, telcos, managed-service providers, and consultants forms the backbone of Brazil’s digital infrastructure. Persistent challenges—including site selection, power availability, supply-chain constraints, taxation, and skills shortages—complicate rapid expansion, yet policy support, abundant renewable energy, and surging regional demand position Brazil to consolidate its role as the subcontinent’s primary data-center hub.
Introduction¶
Data centers are critical infrastructure for the storage, processing, and distribution of digital information. In Brazil, soaring demand for cloud computing, streaming media, fintech, e-commerce, and AI workloads has catapulted the country to the forefront of Latin America’s digital economy. The purpose of this report is to provide an academically structured, end-to-end analysis of the Brazilian data-center value chain—including definition, key participants, commercial dynamics, bottlenecks, business models, and strategic implications. By offering granular insights into every stage of the chain, the report equips investors, policymakers, service providers, and researchers to navigate the opportunities and constraints shaping Brazil’s data-center landscape.
Scope:
• Geographic focus – Federative Republic of Brazil (national market, with regional highlights).
• Industry focus – Retail colocation, wholesale/hyperscale, cloud, interconnection, managed services, and ancillary support.
• Time horizon – Current market structure (2024) with projections to 2029–2030 where relevant.
Value Chain Definition¶
Overview of Steps¶
- Planning & Design
- Construction & Infrastructure Deployment
- Technology & Equipment Supply
- Data-Center Operations & Management
- Connectivity & Network Services
- Data-Center Services (Colocation, Cloud, Managed)
- Ancillary & Support Services
Detailed Description of Each Step¶
Step | Core Activities | Typical Segments | Representative Players |
---|---|---|---|
Planning & Design | Market feasibility, site selection, capacity planning, architectural & MEP design, permitting | IT infrastructure consulting; critical-environment engineering | Zeittec, CBRE, JLL, Jacobs, AECOM |
Construction & Infrastructure Deployment | Civil works, electrical & mechanical installation, fire & security systems, testing/commissioning | General contractors; specialized EPC; system integrators | Zeittec (turn-key), SONDA Brasil, Tecnocomp, Sonda Engenharia |
Technology & Equipment Supply | Servers, storage, networking, DCIM software, security appliances | OEMs; distributors; VARs | Dell Technologies, HPE, Cisco, Huawei, Schneider Electric, Vertiv, Furukawa, Westcon |
Operations & Management | 24×7 monitoring, maintenance, security, incident response, energy management | Internal DC ops teams; managed-service providers (MSPs) | Ascenty, Equinix, Scala, ODATA, Cirion, EVEO, TC do Brasil, green4T |
Connectivity & Network Services | Internet transit, dark fiber, cross-connects, cloud on-ramps, IX peering | Telcos; ISPs; IXPs; carrier-neutral DC operators | Claro, Telefônica/Vivo, TIM, Oi, Algar, IX.br, Ascenty Network, Cirion, Equinix Fabric |
Data-Center Services | Retail colocation, wholesale/hyperscale, IaaS/PaaS/SaaS, managed hosting | Colocation providers; hyperscalers; MSPs & cloud natives | Ascenty, Equinix, Scala, ODATA, HostDime, AWS, Microsoft Azure, Google Cloud, Oracle Cloud, Tivit, Sonda |
Ancillary & Support | Consulting, migration, compliance (LGPD, PCI DSS), maintenance, training | IT consultancies; security firms; facilities O&M | Bravo Tecnologia, CBRE, green4T, IBM Consulting, Accenture |
Aggregate Market Metrics¶
• Installed IT Power (2024): ≈ 0.74–0.78 GW
• Forecast IT Power (2029): ≈ 1.2 GW (CAGR ≈ 10%)
• Colocation Revenue (2024): ≈ US$ 2 billion → US$ 3.5 billion by 2029
• Total Annual Market Value: ≈ US$ 5 billion
• Facilities: 135–185 active data centers; ~50 % in São Paulo state
• CAPEX Intensity: ~R$ 53 million per MW; hardware/software ≈ 62 % of initial CAPEX
Players Analysis¶
Leading Colocation & Hyperscale Operators¶
- Ascenty (Brookfield & Digital Realty JV)
• 34 sites in LatAm, 20 in Brazil; > 116 MW in SP alone
• 5,000 km proprietary fiber network; carrier-neutral; Tier III/IV certs - Equinix
• SP & RJ IBX campuses; global Platform Equinix; dense interconnection ecosystem - Scala Data Centers
• Focus on hyperscale; R$ 3 billion new funding; “Scala AI City” (54 MW initial, potential US$ 50 billion) in Rio Grande do Sul - Cirion (ex-Lumen Latin America)
• 18 data centers across 7 LatAm countries; 4,900+ interconnects - ODATA (Aligned Data Centers portfolio)
• Facilities in SP and RJ; expansion to Colômbia, Chile, Mexico
Telecommunications & Network Providers¶
• Claro (América Móvil), Telefônica/Vivo, TIM, Oi, Algar – national carriers supplying IP transit, MPLS, dark fiber.
• IX.br – world’s largest public IXP by traffic (SP & RJ points).
IT Integrators & MSPs¶
• green4T – DCIM, facility management, migration projects.
• TC do Brasil – remote hands, hybrid-cloud management.
• EVEO – managed colocation & cloud hosting.
Engineering, Design & Construction Specialists¶
• Zeittec – turn-key critical-facility design/build.
• Sonda Engenharia – EPC for electrical and HVAC systems.
• Tecnocomp – modular DC builds, prefabricated solutions.
Hyperscale Cloud Platforms (Customers & Partners)¶
• Amazon Web Services, Microsoft Azure, Google Cloud, Oracle Cloud – lease wholesale capacity and operate edge zones inside Brazilian colocation campuses, stimulating large-block demand (> 6 MW per hall).
Estimates of Player Scale (2024)¶
Company | Brazilian Capacity (MW) | Facilities (operational + under construction) | Core Focus |
---|---|---|---|
Ascenty | 300 + (total LatAm); 150 + in Brazil | 20 | Wholesale colocation, connectivity |
Equinix | ≈ 70 | 5 | Retail colo & interconnection |
Scala | 90 live; pipeline 250 + | 7 | Hyperscale campuses |
Cirion | 20 + | 2 (BR) | Carrier-neutral colo |
ODATA | 40 + | 4 | Wholesale colo |
HostDime | 15 | 1 flagship in João Pessoa + edge POPs | Retail/edge |
(Figures derived from public announcements and industry reports; may vary by reporting date.)
Commercial Relationships¶
• Planning/design contracts: fixed-fee or milestone-based service agreements between investors and consulting/engineering firms (e.g., Zeittec, CBRE).
• Construction: EPC or lump-sum turnkey contracts with general contractors; performance bonds common.
• Equipment procurement: OEM direct sales or via distributors; occasional leasing/opex models to mitigate FOREX swings.
• Operations outsourcing: data-center owners may subcontract facilities management or remote-hands SLAs to MSPs (green4T, TC do Brasil).
• Colocation: long-term (3–15 yr) space-and-power leases; power usage plus cross-connect fees; SLAs ≥ 99.99 % uptime.
• Cloud services: consumption-based (pay-as-you-go) or reserved-instance pricing; multiyear enterprise agreements.
• Connectivity: recurring monthly charges for cross-connects, IP transit, wavelength services; IRU (indefeasible right of use) for dark fiber.
Bottlenecks and Challenges¶
- Site & Power Availability
• Limited parcels with dual-fed > 100 MVA grid capacity near metro fiber routes.
• Lengthy utility interconnection timelines (18–24 months). - Permitting & Bureaucracy
• Environmental, municipal zoning, and ANEEL (energy regulator) approvals cause delays and add cost. - Supply-Chain & Import Taxes
• High import duties (e.g., 14–16 % on servers) plus currency volatility inflate CAPEX; customs clearance can add 4–6 weeks. - Skilled Labor Shortage
• Demand for Uptime-accredited engineers, BICSI/RCDD designers, and certified electricians exceeds supply. - Energy Cost & Sustainability
• Power tariff fluctuations affect opex; pressure to lower PUE (< 1.4) and procure renewable PPAs. - Connectivity Constraints Outside SP/RJ
• Fewer carrier options lead to higher bandwidth costs and reduced redundancy in secondary markets. - Security & Compliance
• Rising cyber-physical threats, LGPD enforcement, and sector-specific rules (financial, healthcare) require continuous investment.
Value Chain Relationships and Business Models¶
At each hand-off, specific products, services, and contract types dominate:
From → To | Products / Services Exchanged | Predominant Contract / Business Model | Transactional Pain-Points |
---|---|---|---|
Consulting/Engineering → Investor | Feasibility study, detailed design | Fixed-fee milestone or % of total build cost | Scope creep; design changes |
Construction Consortium → DC Owner | Completed shell & core, MEP systems | EPC / GMP contract | Material lead times; integration risk |
OEM/Distributor → DC Owner | Servers, UPS, chillers, DCIM licenses | Capex purchase or leasing | Import taxes; currency swings |
Telco/ISP → DC Operator & Tenants | IP transit, wavelengths, dark fiber | Recurring MRC + NRC (install) | Limited competition in non-metro areas |
DC Operator → Colocation Tenant | Space, power, cross-connects, remote hands | 3–10 yr lease; kW pricing; SLA | Power-rate pass-through; capacity planning |
Hyperscaler → Enterprise End-User | Cloud compute/storage, SaaS | Usage-based (per-second/hour) | Data-sovereignty, egress fees |
MSP → Tenant | Managed backup, SOC, patching | Monthly per-device or tiered | Skills retention; SLA penalties |
Bottlenecks often materialize at the construction-to-operations interface (commissioning delays) and between telcos and DCs in regions with scarce fiber. Business-model innovation—such as sale-and-leaseback of powered shells, green PPAs, and modular edge deployments—aims to alleviate capital intensity and time-to-market.
Conclusion¶
Brazil’s data-center value chain is robust, vertically integrated, and increasingly sophisticated, yet still grapples with infrastructural, regulatory, and talent-related constraints. The dominance of São Paulo mirrors the concentration of enterprise demand and carrier density, but secondary metros (Campinas, Rio de Janeiro, Fortaleza, Porto Alegre, Brasília) are rapidly scaling. Continued policy support (e.g., BNDES credit lines, tax incentives), grid modernization, and renewable-energy integration will be decisive for sustaining 10 %+ annual capacity growth. For investors, the sweet spots lie in hyperscale build-to-suit, edge facilities tied to 5G roll-outs, and value-added managed services. Further academic and industry research should quantify PUE improvements, map workforce-development pipelines, and benchmark Brazil’s colocation pricing against global peers.
References¶
• Estudo sobre o Mercado de Data Centers no Brasil.
• Tamanho do mercado de data center no Brasil e análise de participação – Mordor Intelligence.
• Todos os Data Centers que serão lançados em 2024 – Data Center Dynamics. https://www.datacenterdynamics.com/pt/opiniao/todos-os-data-centers-que-serao-lancados-em-2024/
• Scala Data Centers – Expansão e Vagas. https://www.scaladatacenters.com/pt/em-expansao-scala-data-centers-anuncia-60-vagas-para-diversas-areas/
• Colocation – Cirion Brasil. https://www.cirion.com/pt/data-center/colocation/
• Data Center Services – green4T. https://green4t.com/servicos/data-center-services/
• Data Centers: Perspectivas e Desafios para Implantação no Brasil – ABINEE. https://abinee.org.br/media/files/ABINEE_Data_Center_Perspectivas_e_Desafios.pdf
• Soluções em Data Center – CBRE Brasil. https://www.cbre.com.br/pt-br/services/industries/data-centers
• Conformidade Regulatória de Data Center no Brasil – Bravo Tecnologia. https://bravotecnologia.com.br/blog/conformidade-regulatoria-de-data-center-no-brasil/
• NUV Datacenter. https://nuv.com.br/
• Cinco aspectos de segurança para considerar ao contratar um data center – DCD. https://www.datacenterdynamics.com/pt/guia-essencial/cinco-aspectos-de-seguranca-para-considerar-ao-contratar-um-data-center/
• Investimentos em data centers devem chegar a quase US$ 2 bilhões até 2026 – Estadão. https://www.estadao.com.br/economia/investimentos-em-data-centers-devem-chegar-a-quase-us-2-bilhoes-ate-2026/
• Investimentos em data centers crescem no Ceará, no Brasil e no mundo – TrendsCE. https://trendsce.com.br/investimentos-em-data-centers-crescem-no-ceara-no-brasil-e-no-mundo/
• ‘Efeito DeepSeek’ aumenta oportunidades para data centers – InvestNews. https://www.investnews.com.br/tecnologia/efeito-deepseek-aumenta-as-oportunidades-de-negocio-para-data-centers-do-brasil-diz-ascenty/
• Colocation em Data Center: Benefícios – HostDime. https://www.hostdime.com.br/blog/colocation-em-data-center-conheca-os-beneficios/
• Construção de Data Center corporativo em 11 passos – Zeittec. https://zeittec.com.br/construcao-de-data-center-passo-a-passo/
• Data Center – Cirion Brasil. https://www.cirion.com/pt/data-center/
• NextStream. https://nextstream.com/pt/
• Segurança para Data Center: Três Pilares – IPNews. https://ipnews.com.br/seguranca-para-data-center-tres-pilares-e-uma-abordagem-multidisciplinar/
• Desafios no planejamento de Data Centers no Brasil – DCD. https://www.datacenterdynamics.com/pt/broadcasts/os-desafios-no-planejamento-da-construcao-de-data-centers-no-brasil/
• O Brasil será um hub global de data centers? – Capital Reset. https://capitalreset.com/data-centers-brasil-hub-global-inteligencia-artificial-ia-sustentabilidade-energia/
• Brasil avança em data centers – NeoFeed. https://neofeed.com.br/negocios/brasil-avanca-em-data-centers-e-caminha-para-se-tornar-a-nova-fronteira-do-setor/
• Nova regra para data centers deve atrair R$ 2 tri – Poder360. https://www.poder360.com.br/economia/nova-regra-para-data-centers-deve-atrair-r-2-tri-em-10-anos/
• Cuidados de segurança em Data Centers – Ligga Telecom. https://liggatelecom.com.br/blog/seguranca-em-data-centers/
• Colocation Gerenciado – EVEO. https://www.eveo.com.br/data-center-colocation/colocation-gerenciado/
• GIC e Alianza vão investir R$ 2 bi em data centers – Metro Quadrado. https://www.metrom2.com.br/gic-e-alianza-vao-investir-r-2-bi-em-data-centers/
• Serviços Gerenciados – Claro Empresas. https://claro.com.br/empresas/solucoes/servicos-gerenciados
• Destaque: Datacenters da Ascenty – BNamericas. https://www.bnamericas.com/pt/noticias/destaque-datacenters-da-ascenty-em-desenvolvimento-na-america-latina
• Gestão de Data Center – TC do Brasil. https://tcdobrasil.com.br/servicos/data-center/
• Data centers em São Paulo – Equinix. https://www.equinix.com/br/data-centers/americas/brazil/saopaulo
• Managed Services Brazil & Canada – Equinix. https://www.equinix.com/br/resources/data-sheets/managed-services-brazil-and-canada
• ABDI – Data Centers. https://abdi.org.br/estudo/data-centers/
• Data Center Turnkey – Zeittec. https://zeittec.com.br/data-center-turnkey-projeto-construcao/
• Vinhedo: Maior Data Center do Brasil – Ascenty. https://ascenty.com/blog/vinhedo-maior-data-center-brasil-america-latina/
• Scala seguirá investindo em São Paulo – DCD. https://www.datacenterdynamics.com/pt/noticias/scala-data-centers-revela-que-seguira-investindo-em-sao-paulo/
• Construção de Data Center: Como Fazer? – Tecnocomp. https://tecnocomp.com.br/blog/construcao-de-data-center-como-fazer/
• Desafios para construção Fast Track – DCD. https://www.datacenterdynamics.com/pt/opiniao/desafios-e-orientacoes-para-construcao-fast-track-de-data-centers/
• GRI Data Center Summit 2024 – GRI Club. https://www.griclub.org/event/gri-data-center-summit-2024
• Case Scala Data Centers – Grupo Taking. https://grupotaking.com.br/case-scala-data-centers/
• Ascenty inicia construção de mais um data center – Infra News Telecom. https://infranet.com.br/2022/10/ascenty-inicia-construcao-de-mais-um-data-center-em-sao-paulo/
• Mercado de data center cresce no Brasil – JLL. https://www.jll.com.br/pt/trends-and-insights/research/mercado-de-data-center-cresce-no-brasil-com-campinas-liderando-e-rio-de-janeiro-se-consolidando
• Mercado de data center cresce – TI Inside. https://tiinside.com.br/07/03/2024/mercado-de-data-center-cresce-no-brasil-com-campinas-liderando-e-rio-de-janeiro-em-expansao/
• Scala estima US$ 50 bi para complexo de data center – BNamericas. https://www.bnamericas.com/pt/noticias/scala-estima-us-50-bi-para-complexo-de-datacenter-no-rio-grande-do-sul
• Scala capta R$ 3 bi para IA – Startupi. https://startupi.com.br/2024/09/scala-data-centers-capta-r-3-bilhoes-para-acelerar-infraestruturas-de-ia-na-america-latina/